Studio City, CA · ECC / HERS Testing

ECC testing in Studio City

Studio City jobs tend to be remodels and additions on older homes, and the testing has to fit around a crew that is already mid-project. We schedule around your build, not the other way round.

Ben measuring register airflow with a capture hood

Testing in Studio City

Additions are common here, and an addition often extends the existing duct system rather than adding a new one. When that happens the test covers the whole system, old and new, and the old part is usually where the leakage is. Telling the homeowner that early saves an awkward conversation at final.

Studio City is part of the City of Los Angeles, so permits and inspections go through LADBS, the City of Los Angeles Department of Building and Safety.

  • Additions that extend existing duct systems
  • Whole-house remodels
  • HVAC replacements
Permits and final inspectionLADBS
RegistryCHEERS, rater RCN14576
PaperworkReport and certificate the same day

How it works

  1. 1Tell us about the job

    Address, scope, and where you are in the permit. Two minutes by phone or text.

  2. 2We schedule around your build

    Rough and QII while the framing is open, final once the system runs.

  3. 3Testing on site

    Calibrated equipment and a straight answer on the spot.

  4. 4Report and registration

    Report plus the signed CHEERS certificate, the same day.

Need a test in Studio City scheduled?

Call or text with the address and where you are in the permit. We will come back with a time and a price.